Re: BREAKING NEWS!!!!!!!!!!!!!!!!...
in response to
by
posted on
Apr 29, 2008 04:35AM
(PRESS PROFILE TAB FOR FACT SHEET & UPDATES)
<<
Results from current diamond drill program on BigSky Property
From To Thickness Gold Grade
DDH (metres) (metres) (metres) (gpt)
B003(1) 37.7 38.5 0.8 4.64
B004(1) 33.3 35.5 2.2 3.46
Incl 34.8 35.5 0.7 8.69
And 48.0 49.2 1.2 0.51
B005 71.4 76.3 4.9 0.64
Incl 71.4 72.8 1.4 1.18
And 96.8 98.0 1.2 5.87
B006 83.8 85.0 1.2 1.35
B008 31.6 34.9 3.3 2.09
Incl 32.3 33.6 1.3 4.78
B013 36.0 38.0 2.0 1.62
(1) drillholes previously reported
Drillholes B007, 9 and 10 did not intersect significant gold values in
WK Shear. Drillholes B011, 12, and 15 to 19 and 23 tested a different
shear zone as did B022, 26, and 27, none of which intersected significant
gold values.
>>
Diamond drilling is continuing with two drills currently active on the Ormsby Zone during break-up. The drill on BigSky has been temporarily shutdown and will restart again in May. Additional targets on Clan Lake, Goodwin Lake and at Nicholas Lake will be drilled as the three drills on our properties become available.About Tyhee Development Corp.Tyhee Development Corp. is a gold exploration and development company currently focused on the historic Yellowknife Gold Camp, NWT, Canada. It is the largest property holder in the historic camp, and has the largest exploration and development program underway in the region. Its principal asset is the advanced-stage Yellowknife Gold Project, which consists of 6,625 hectares (15,481 acres) of mining leases located 90 km (56 miles) north of Yellowknife, NWT, Canada. Three additional gold properties have been acquired within the Yellowknife Gold Belt and further acquisitions are being considered.Tyhee completed fire assays on drill core samples using 30 gram aliquots with ICP-ES finish for gold analyses, prepared at Acme Analytical Laboratories Ltd. in Yellowknife, and finished at Acme Analytical Laboratories Ltd in Vancouver. A semi-quantitative multi-element analysis is run on 0.5 gm aliquot samples leached in a hot aqua regia solution and measured using ICP-ES techniques. Tyhee conducts a rigorous QA/QC program of inserting blanks and duplicates in the field and standards in the laboratory. The laboratory also conducted their own independent QA/QC program including inserting their own standards and rerunning samples from pulped material and reject material. These results were provided to Tyhee. All standards, duplicates, blanks and check assays returned acceptable results. Mr. V. Pratico, P.Geol., the designated QP within the meaning of NI 43-101, has reviewed this release and approves of its content.To view a map of the BigSky Drill Program, please visit:http://files.newswire.ca/476/BigskyD... Breaking News <<
Results from current diamond drill program on BigSky Property
From To Thickness Gold Grade
DDH (metres) (metres) (metres) (gpt)
B003(1) 37.7 38.5 0.8 4.64
B004(1) 33.3 35.5 2.2 3.46
Incl 34.8 35.5 0.7 8.69
And 48.0 49.2 1.2 0.51
B005 71.4 76.3 4.9 0.64
Incl 71.4 72.8 1.4 1.18
And 96.8 98.0 1.2 5.87
B006 83.8 85.0 1.2 1.35
B008 31.6 34.9 3.3 2.09
Incl 32.3 33.6 1.3 4.78
B013 36.0 38.0 2.0 1.62
(1) drillholes previously reported
Drillholes B007, 9 and 10 did not intersect significant gold values in
WK Shear. Drillholes B011, 12, and 15 to 19 and 23 tested a different
shear zone as did B022, 26, and 27, none of which intersected significant
gold values.
>>
Diamond drilling is continuing with two drills currently active on the Ormsby Zone during break-up. The drill on BigSky has been temporarily shutdown and will restart again in May. Additional targets on Clan Lake, Goodwin Lake and at Nicholas Lake will be drilled as the three drills on our properties become available.About Tyhee Development Corp.Tyhee Development Corp. is a gold exploration and development company currently focused on the historic Yellowknife Gold Camp, NWT, Canada. It is the largest property holder in the historic camp, and has the largest exploration and development program underway in the region. Its principal asset is the advanced-stage Yellowknife Gold Project, which consists of 6,625 hectares (15,481 acres) of mining leases located 90 km (56 miles) north of Yellowknife, NWT, Canada. Three additional gold properties have been acquired within the Yellowknife Gold Belt and further acquisitions are being considered.Tyhee completed fire assays on drill core samples using 30 gram aliquots with ICP-ES finish for gold analyses, prepared at Acme Analytical Laboratories Ltd. in Yellowknife, and finished at Acme Analytical Laboratories Ltd in Vancouver. A semi-quantitative multi-element analysis is run on 0.5 gm aliquot samples leached in a hot aqua regia solution and measured using ICP-ES techniques. Tyhee conducts a rigorous QA/QC program of inserting blanks and duplicates in the field and standards in the laboratory. The laboratory also conducted their own independent QA/QC program including inserting their own standards and rerunning samples from pulped material and reject material. These results were provided to Tyhee. All standards, duplicates, blanks and check assays returned acceptable results. Mr. V. Pratico, P.Geol., the designated QP within the meaning of NI 43-101, has reviewed this release and approves of its content.To view a map of the BigSky Drill Program, please visit:http://files.newswire.ca/476/BigskyD...