MT-22 ZONE
All of the results can be seen on the longitudinal section on Strateco's website (www.stratecoinc.com). The most interesting holes drilled since March 18 on the new MT-22 zone are as follows: Hole MT-08-028 intersected 0.47% eU3O8 over a 41.6 -metre length, including 2.40% eU3O8 over 7.0 metres. Hole MT-08-022 intersected 0.37% eU3O8 over 18.40 metres including 1.16% eU3O8 over 5.3 metres.
bold is mine.....
Too bad about the one drill hole by Cameco's proptery. Too much sand and water.
Just what is it going to take to increase the spot price?
Holding strong