Well then they had drilled two holes by the 26th September, when they began to use two drills, so two holes every three days after that date, to reach 26 (plus the 2 ), so perhaps 40 to 45 days to complete all drilling scheduled. Today is the 10th, and two drills have been going at it for 14 days now, and the first drill did two holes before that. They might have done 11 or 12 holes by now, if there were no unforseen problems, so very likely they have drilled 10 holes as of today, since Mr Murphy does hang out in the ROF, I believe.
Murphys Law - what can go wrong, might.