"Now SPQ is indrilling/filling the rest of Big Daddy, they have already drilled about 500 Ft laterally, and intend to drill another 700 to 900 metres laterally north east direction to confirm the extension of this part of Big daddy which eventually, will be confirmed of a total of about 1200 metres/or 3800 FT. long."
I have only one thing to say to that.....Amen.
Mr. Novak needs to keep them drills turning on and up NNE towards L2000E, this is likely a mirror of the FWR deposit as you say.
Good Stuff
