Welcome To The Snowfield Development Corp. HUB On AGORACOM

(Edit this message through the "fast facts" section)

Free
Message: Re: I really wish.... this is not specific... about 10 days?

Nov 19, 2007 10:52AM

Re: I really wish.... this is not specific... about 10 days?

in response to by
posted on Nov 19, 2007 11:00AM

From NR:

 

Drilling

Both of Snowfield's drill crews are currently on scheduled time off but drilling will resume on Nov. 16, 2007, with both drills operational. Ground magnatometer surveys are currently being conducted to locate and refine additional drill targets.

A sample of core from hole No. Swamp07-01 has been sent to a laboratory for 32-element assay. Results are expected in approximately 10 days.

Share
New Message
Please login to post a reply