Correct, short ride from the airport.

I did the electrical side...lol.

We had trouble with the flooring in the main electrical rooms where the 15KV equipment was placed. The floors sank, effecting the concrete pads. Some fancy custom fixes were needed and it was not cheap.

Interesting project.

I also did the missle silo projects...awesome.

Been to the college too.

Oh, and Santas Village I think it was called, plus went to the pipe line and touched it...HOT!