..with 20 stopes maned and working on a two shift schedual, and if this mining is from the bulk sample area of.63 gr/tn that cost out at a $183./tn then the oz"es would add up ( 12 x 12 x 10 = 1440 cubic ft divided 11.4 cu ft - 129 tns ) !. We ( my - self ) can only guess as to what areas are being mined, if underground then production is lost due to time delays hoisting as the ore & cage are combined. The Mill blend of feed from different areas requires good lab work. I think San is more interested on exploration then on mining and i can not say i would do anything different knowing the size of this elephant..buy low - sell high..long on the Greens,Traps7