Last week I posted that the website stated that the mill was at capacity. I phoned IR about that wondering what capacity was. They have since updated the website to read.
- Hinge Mine and Shoreline Basalt deposits accessed from two ramp portals.
- Historic Rice Lake shaft mine remains in production, accesses 1,650 m (5,500 feet) below surface.
-
Onsite Mill: Upgrades completed, capacity now exceeding 1,500 tpd and climbing.
Also on the website is the link to the AGM circular. Everytrhing you always "didn't" want to know about options.
http://www.sangold.ca/i/pdf/2011_06_AGM_Circular.pdf