Does any one know if a lay up is required to do the upgrade. If so how long would the mill be down. Perhaps they want to finish the bulk sample on the007 first. The upgrade will be needed after the RLM is developed above 26 level and the two surface mines are contributing. We know the A shaft can deliver 2000 tons per day. So it will not be too distant in the future that an 1800 tpd mill will be obsolete.