zmrch3m, ..I guess as San progresses forward with their developement of stopes and drifting to new locations, San should hit their long term targets of 250,000 oz of production. I guess new underground drill plat forms well allow extensive drilling for the next decade as new resources have to be found in order that San can be a long term producer. I see yrs out a new deep shaft sunk to help improve production and lower cost. I guess SKP if drilling proves up resources well add to Sans mine life because of their close proximity to the Mill. San likely has a two yr supply of drill core waiting for analyises through the lab and with ten drills running should always maintain a good supply. San has to do alot of infill drilling as this raises our reserves to indicated and measured resources which becomes a high standard on our 43-101. I guess the Greens will see a never end drilling program through out the belt and eventually Ned and son ( Dundee ) well decide that they have seen enough core and then the market well see a summary of Sans holdings. Long On The Golden FairWay.Traps