First off I don't believe that 3 mil. is expected from the 43-101. Total mine oz with the 43-101 is expected to be about 3 mil.
Which leaves about 1.5 mil for the hinge 43-101. I believe that was TD's estimate. If the grades on the bulk sample hit 3/4 oz or higher we don't have to use to use 1 oz/ton as the cut off. According to Dale that could increase the 43-101 by 30% or to 1.95 mil oz. for a total of 3.55 mil oz. Isn't it easier to prove up a good bulk sample then to add on more drill results?
Cheers