Message: decline ramp to the hinge is almost in the pay zone.

decline ramp to the hinge is almost in the pay zone.

posted on Feb 20, 2009 06:52PM

Soon we'll see how big those hinge zone viens are. The ramp access opening is about 14ft x 14ft..... that's one big window looking into the rock. Every day forward will be another 20 ft of length. You think they'll find more gold, you can bank on it.

A multi kilo nugget, bigger than the last one (which is on display in Ottawa) would be grand.

cheers

February 19, 2009

Dale Ginn, CEO of San Gold Corporation (SGR: TSX-V) is pleased to report that ongoing surface drilling continues to both

define and extend the newly discovered Hinge #4 zone along strike to the east and to the west. Hole # GS-09-27 encountered

28 g/tonne (0.82 oz/ton) gold over 8.2 meters (27 ft) including a higher grade intersection of 101 g/tonne (2.94 oz/ton)

gold over 2.0 meters (6.6 ft) at a vertical depth of 110 meters near the elevation intended to be developed first by the ongoing

decline ramp access. Over 700 meters (2300 ft) of decline access has been completed to date, with less than week of access

development remaining before reaching the first ore levels. Hole #’s GS-08-101, GS-08-103 and GS-08-107 extended the

Hinge zone along strike to the east, while hole #’s GS-09-15 and GS-09-17 extended the Hinge zone along strike to the west.

All of the holes listed below contain visible gold and pyrite within quartz veins that are in clear, sharp contact with the host volcanic

rocks, as well, core recoveries were nearly 100%





.