Welcome To The Questerre Energy HUB On AGORACOM

(Edit this message through the "fast facts" section)

Free
Message: RESULTS FROM GENTILLY HZ WELL ARE COMING...

If we estimate about 4 weeks of testing, you are probably right.

So, what can we expect ?

A 700 m long horizontal leg with 5 fracs in two different zones(middle- and lower Utica) where the lower has not been tested yet. Talisman and Qec have so far targeted the middle Utica with great success.

I guess that 3 of the fracs have been set in the middle Utica and 2 in the lower.

Compared to St.Edouard, Gentilly lies in the unstructural part where we can expect lower IP, but on the other hand only 2 or 3 fracs were successful in St.Edouard.

If we expect all 5 fracs to be successful and that the lower Utica is just as good as the middle, then I guess that a lot of people will be surprised.

Rgds

Share
New Message
Please login to post a reply