Welcome To The Questerre Energy HUB On AGORACOM

(Edit this message through the "fast facts" section)

Free
Message: New Horizontal Well

New Horizontal Well

posted on Sep 17, 2009 09:23PM

http://sigpeg.mrnf.gouv.qc.ca/gpg/pdf/drilling_activities_2009.pdf

Talisman Energy, Saint Édouard
HZ no. 1a

Planned Depth = 1922 m Kb

Distance from previous well = 15.64 kilometers or 9.71 miles (Using GPS Coorindate Distance Calculator).

8 to 10 stage frac = 8 to 10 multiplier (maybe)

I believe 1922 meters is the location of the targeted section of the middle interval of the Utica (Forest take notes)!

Share
New Message
Please login to post a reply