Re: Stock price challenge round #2
in response to
by
posted on
Jun 17, 2009 06:19PM
(Edit this message through the "fast facts" section)
Hey Lifenergy,
I'm not exactly sure on any of those details other than what you mentioned. Yes they do plan to do horizontals, but I believe some verticals as well. This is a pilot so I believe it was somewhere around 6 wells, possibly a combination of both. Yes, for the horizontals, they'll be doing an 8 stage frac...forest only did 4, but with a full scale production, 8 would be the ideal. Talisman is definantely not messing around. They'll add 8 fracs and I'd bet my bottom dollar that they'll have all the equipment needed to carry out a proper drill.
You are right, Forest will be re-entering the two verticals this summer...but I asked Anela, and she doesn't have a time set...though she did say it was this summer.
Hope that helps. I was a bit vauge with the 2010 drilling for Talisman...if anyone knows for sure, could they add it. I'm in a bit of a rush so I won't be able to find it.
Thanks,
Rocco:)