On Track for a New Mine

Discovery and development of precious metals - New Brunswick & Manitoba

Free
Message: ..Puma, skarn deposit

Puma intersects 1% Cu over 97 metres on its Turgeon, New Brunswick deposit

Rimouski, October 20, 2009 - In its drillhole F09-01, Exploration Puma (PUM-TSXV) has

encountered a major intersection more than 60 metres in length, including 1.5 % Cu over 63 metres

and 1 % Cu over 97 metres............................

The main goals of this drill campaign were to confirm the geologic model of the deposit, i.e., to

characterize the metal zoning of the VMS (volcanogenic massive sulphide type) model, to define the

nature of the VMS deposit in terms of various geologic parameters (structure, alteration, and

lithology), and to confirm the continuity of the mineralization present.


Read more at http://www.stockhouse.com/bullboards/messagedetail.aspx?s=pum&t=LIST&m=31666609&l=0&pd=2&r=0#7quoeMz4IBVBK11B.99

Share
New Message
Please login to post a reply