Puma intersects 1% Cu over 97 metres on its Turgeon, New Brunswick deposit
Rimouski, October 20, 2009 - In its drillhole F09-01, Exploration Puma (PUM-TSXV) has
encountered a major intersection more than 60 metres in length, including 1.5 % Cu over 63 metres
and 1 % Cu over 97 metres............................
The main goals of this drill campaign were to confirm the geologic model of the deposit, i.e., to
characterize the metal zoning of the VMS (volcanogenic massive sulphide type) model, to define the
nature of the VMS deposit in terms of various geologic parameters (structure, alteration, and
lithology), and to confirm the continuity of the mineralization present.
Read more at http://www.stockhouse.com/bullboards/messagedetail.aspx?s=pum&t=LIST&m=31666609&l=0&pd=2&r=0#7quoeMz4IBVBK11B.99