Welcome To The Prophecy Resources HUB On AGORACOM

1.4 billion tonnes of coal need I say more? If so keep on reading.

Free
Message: Prophecy Reports Multiple 1g/t Rhodium and 10g/t Platinum Group Metals Chip Samp

If anyone wants to chew the fat feel free. I don't want to be the only one with something to write.

I want to read others .02 as well.

Why go elsewhere to do so when we can do it here without the bashers?

At any rate there is a new updated presentation on the site that has some BIG Changes as pointed out elsewhere.

Mostly is the lower Capex that will not require us to do a major financing in the near future to rail the coal.

There are other plans that would eliminate the need for it. I'm not sure what that plan will be but we can speculate. It has been brought up that up that we will buy or lease our own fleet of trucks and truck it. "We could also use the trucks for Chandgana"....? ... Until the power plant permit is in place? Possibly to truck the coal to local power plants that are in dire need of coal due to transformation from diesel to coal???

The Capex for the wash is also not listed. I know there will be enough cashflow to use those funds to construct the washing plant by the time it's needed. But I wonder what other plans might be in the works.

The Lynn Lake program is complete and news will be forthcoming Very soon.

The Met. results from Lynn lake will also be in anytime in the next 4 months ish. This will be fill in a lot of blanks in using the bio leach technology that is currently planned. After we know this Lynn Lake will be Pushed to feasibility.

Share
New Message
Please login to post a reply