Some notes:
- they are projecting the pit depth to increase from 150 m to 250 m on several of the x-sections but that won't be pinned down until the PEA is updated
- hole 20 has 2 intercepts with a combined length of 108 meters @ .54 g/t (above the cut-off of .35 g/t), which justifies more drilling to the SW to extend the deposit
- resource upgrading and width extension are continuing
- I'm not sure about the potential in the Milestone area but they are tying up more land. As long as they keep their eye on the ball ( Magino) then that's not a problem
- major events coming up will be a resource update, PEA update and vertical well results
- meanwhile we should see a series of assay results released this summer
I'm standing pat with my shares and expect a $ 1/share is a reasonable target