Re: News out - email recieved from IR
in response to
by
posted on
Feb 29, 2008 06:09AM
Creating shareholder wealth by advancing gold projects through the exploration and mine development cycle.
VANCOUVER, BRITISH COLUMBIA--(Marketwire - Feb. 29, 2008) - Kodiak Exploration Limited (TSX VENTURE:KXL)(FRANKFURT:KX3) is pleased to report that the first two deep holes drilled along the central portion of the Golden Mile, 100 metres apart, have confirmed the continuity of gold mineralization down hole to a depth of almost 300 metres. Additional drilling has confirmed excellent continuity of high grade mineralization to a depth of approximately 100 metres. Exploration drilling continues on the company's 100% controlled Hercules project in western Ontario.
These drill results show that gold mineralization in the central Golden Mile has excellent internal continuity and that the mineralization extends to almost triple the depth previously tested, greatly increasing the resource potential of the Hercules project. In addition, a series of previously unknown gold bearing veins has been discovered in the one kilometre area between the Marino and the Golden Mile, indicating that the known veins may be part of a much larger overall system.
Kodiak currently has drill rigs working in three distinct areas of the Hercules property: The central portion of the Golden Mile (named Area 51 after drill hole HR07-51, the original discovery hole), Area 29 (approximately one kilometre along the Golden Mile to the southeast of Area 51 and also named for its discovery hole), and the Marino vein, which runs parallel to the Golden Mile vein approximately one kilometre to the northeast. All assay results received to date from our 2008 program are shown in the table below. Please refer to maps on Kodiak's website for locations of the recent drilling.
Area 51 Initial Results - Central Portion of the Golden Mile
The first two deep holes drilled in Area 51 of the Golden Mile have intersected gold mineralization at down hole depths of 250 metres and 300 metres respectively. Spaced 100 metres apart, they have defined a broad envelope of gold mineralization, similar to that seen in the near surface drilling, within which high grade mineralization is typically found. This gold mineralized zone remains open, and additional drilling will test it at greater depths and further along strike in the immediate future.
Highlights from Area 51 include hole HR08-74, which intersected 3.8 metres grading 10.37 gpt (0.3 opt) gold, including 0.5 metres grading 25.72 gpt (0.75 opt). Hole HR08-74 was drilled as part of an in-fill drilling program in the high grade central Golden Mile. The assay results from hole 74 and adjacent drill holes were designed to confirm in-house grade-thickness modeling of this zone and have generated important gold grade vectors to guide the deeper drilling required to target this shoot at depth. The long section shown below illustrates how the close spaced drilling has confirmed the continuity of the high grade zone and suggests a flatter plunge to the gold mineralization. Kodiak has already used this information to successfully guide deeper drilling in Area 51.
Drill holes HR08-81 and HR08-117, the first two deep drill holes on the Golden Mile, have confirmed a wide open and very large envelope of gold mineralization at depth. This envelope, similar in grade and thickness to the gold envelope that surrounds higher grade gold mineralization found in the shallower holes, is a prime target for additional deep drilling aimed at intersecting new high grade gold mineralized shoots at greater depths. The fact that the first two deep holes have confirmed gold mineralization to 300 metres down hole and 100 metres apart along the main structure is an important milestone for Kodiak, because it demonstrates significant exploration potential at depth on the Golden Mile vein system. The Company's 60,000 metre drill program continues, and additional drill results will be reported from this area as they become available.
To view the map accompanying this release please click on the following link: http://media3.marketwire.com/docs/02...
Area 29 Initial Results - Southeastern Extension of the Golden Mile
Kodiak has commenced follow-up drilling in Area 29. The first hole in this area (previously reported) was hole HR07-29, which intersected 2 metres grading 54.0 gpt gold. Encouraging mineralization has now been intersected in HR08-103 (0.4 metres grading 12.4 gpt gold), indicating that the gold mineralization intersected in hole HR07-29 continues along strike and is open both to the southeast and at depth, at a distance of more than one kilometre from the original discovery hole in Area 51. Also, elevated base metals intersected in this section of the Golden Mile indicate close proximity to a potential source for the gold mineralization. Ongoing drilling in this area is designed to outline the geometry and scale of this mineralized zone. Additional drill results will be reported as they become available.
Marino Area Initial Results
Assay results from the first two drill holes of the winter Marino campaign have also confirmed encouraging gold mineralization. Hole HR08-106 intersected a newly discovered vein system that parallels the main Marino vein at a depth of over 100 metres, indicating the presence of "stacked" quartz veining which is intensifying at depth. The Marino program was designed to test the extent of gold mineralization in the area of previously reported drill hole HR07-16 (1.6 metres grading 38.47 gpt gold).
This new parallel vein system greatly expands potential of the Marino area and indicates that stacked veining may occur in other nearby gold bearing veins such as the extensive Yellow Brick Road and the newly discovered series of gold bearing veins located between and parallel to the Golden Mile and Marino systems. Those veins all remain to be drill tested. Initial drilling has shown vein widths at Marino increase dramatically at depth. The discovery of these stacked veins greatly increase the width of the target zone for each structure, and Kodiak's drilling program in this area will need to be expanded accordingly, to explore the full potential of this area to host high grade gold shoots. Additional drill results from this zone will be reported as they become available.
The Ongoing 2008 Drill Program at Hercules
The strategy for the current Hercules drill program remains unchanged. These drill results reinforce the interpretation that the Golden Mile vein system has large, plunging zones or "shoots" of high grade gold mineralization that are enveloped by large volumes of significant gold mineralization. Kodiak will continue to explore extensions to the Golden Mile and Marino vein systems while drilling deeper holes in Area 51 of the central Golden Mile. The initial deeper drilling in Area 51 has confirmed gold mineralization to almost 300 metres along the main structure and this gold mineralization remains open at depth. With the Golden Mile structure intersected at depth, additional drill holes will be required to identify the zones of higher grade gold mineralization within the structure and to provide focus for more detailed drilling to depths beyond 300 metres. Unlike the original shallow drill holes, which were targeted based on surface channel samples, the deeper drilling will be guided only by drill intercepts. This means multiple drill holes will be required to identify the geometry and scale of the host structure. As a consequence, the deep drilling will be a long term program, planned to continue with one rig throughout the year. Simultaneously, another rig will be mobilized to explore previously undrilled sections of the Golden Mile, including the one kilometre section between Area 51 and Area 29 at the southeast extension of the Golden Mile.
Mr. Brian J. Maher, Vice President - Exploration, comments: "I am particularly excited that drilling has confirmed gold mineralization to a depth of 300 metres on The Golden Mile. Documenting such a large area of significant gold mineralization at these depths greatly expands the resource potential of the Golden Mile and surrounding area. This confirms that the system is strongly mineralized at depth, similar to other Archean vein systems such as at Red Lake, Timmins and Kirkland Lake. Recognition of the main Golden Mile structure at depth, in precisely the position projected by our geologic team, suggests that the regular and linear outcrop pattern seen on the surface also continues at depth, greatly simplifying the exploration program."
Mr. Bill Chornobay, President, adds: "We continue to intersect gold mineralization in virtually every drill hole, regardless of which structure or how deep we test. That is a strong indication of the intensity of gold mineralization within this large system. We are in the very early stages of our 2008 drill program and yet this early drilling has already resulted in the discovery of new gold mineralization that substantially increases the overall resource potential of the entire area. With $50,000,000 in cash and the ability to add drills and manpower over the course of our current program, we have the capacity to expand our program as needed. There can be no doubt that we will keep our geologic team very busy throughout 2008."
---------------------------------------------------------------
Hercules Project Drill Hole Summary
From To Interval Gold Gold
Hole Id (metres) (metres) (metres) (gpt) (opt)
---------------------------------------------------------------
HR08-71 35.7 38.9 3.2 3.05 0.089
including 35.7 36.7 1.0 6.53 0.190
HR08-72 27.1 27.4 0.3 5.52 0.161
31.1 33.0 1.9 4.16 0.121
HR08-73 40.1 44.1 4.0 6.96 0.203
including 40.8 41.4 0.7 19.85 0.579
including 43.6 44.1 0.5 25.24 0.736
HR08-74 11.0 11.2 0.2 2.81 0.082
21.0 24.8 3.8 10.37 0.302
including 21.5 24.8 3.3 11.45 0.334
HR08-75 24.5 25.5 1.0 8.98 0.262
32.4 32.6 0.2 3.02 0.088
35.8 36.2 0.4 2.31 0.067
38.5 43.0 4.5 4.60 0.134
including 38.5 40.1 1.6 8.33 0.243
HR08-76 77.6 80.1 2.5 10.30 0.300
HR08-77 98.0 99.0 1.0 5.38 0.157
HR08-79 74.0 74.8 0.8 1.09 0.032
HR08-80 195.0 195.8 0.8 2.27 0.066
203.6 203.9 0.3 1.42 0.041
HR08-81 258.5 259.2 0.7 3.43 0.100
261.8 262.2 0.4 1.08 0.032
HR08-86 83.8 85.7 1.9 1.61 0.047
HR08-102 Anomalous Gold
HR08-103 42.1 42.5 0.4 12.41 0.362
43.8 44.2 0.4 1.74 0.051
HR08-106 127.6 128.0 0.4 1.30 0.038
128.6 129.0 0.4 1.17 0.034
129.9 130.1 0.3 1.07 0.031
131.0 132.2 1.2 1.46 0.043
HR08-107 20.8 21.0 0.2 19.56 0.571
23.3 23.8 0.5 1.20 0.035
25.3 25.7 0.4 2.30 0.067
HR08-116 163.2 164.1 0.9 4.76 0.139
HR08-117 288.8 289.4 0.6 1.06 0.031
290.0 291.5 0.6 2.68 0.078
including 291.2 291.5 0.3 4.03 0.118
This release has been prepared by management - TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this news release.
For more information, please contact
Kodiak Exploration Limited