Pretium Resources Inc. (TSX: PVG) (NYSE: PVG) ("Pretivm" or the "Company") is pleased to report a seventh set of results from the underground infill drill program at the Brucejack Project's Valley of the Kings. Results continue to confirm the style and grade distribution of the Valley of the Kings gold mineralization in the area currently being tested, which includes the intersection of high grade and visible gold. Reported assays include six intersections grading greater than 1,000 grams per tonne gold. (See Table 1 below for assays.)

Selected drill highlights include:

--  Hole VU-633 intersected 428.43 grams of gold per tonne uncut over 14.00
    meters, including 11,650 grams of gold per tonne uncut over 0.50 meters;
--  Hole VU-592 intersected 37.87 grams of gold per tonne uncut over 28.00
    meters, including 1,760 grams of gold per tonne uncut over 0.50 meters;
--  Hole VU-598 intersected 46.15 grams of gold per tonne uncut over 34.00
    meters, including 1,660 grams of gold per tonne uncut over 0.50 meters;
--  Hole VU-622 intersected 77.30 grams of gold per tonne uncut over 9.54
    meters, including 1,425 grams of gold per tonne uncut over 0.50 meters;
--  Hole VU-648 intersected 40.46 grams of gold per tonne uncut over 17.13
    meters, including 1,245 grams of gold per tonne uncut over 0.50 meters;
--  Hole VU-637 intersected 26.16 grams of gold per tonne uncut over 28.85
    meters, including 1,410 grams of gold per tonne uncut over 0.50 meters.

Holes VU-633 and VU-637 were drilled from the 1260-meter drill bay, hole VU-598 was drilled from the 1270-meter drill bay while holes VU-592, VU-622 and VU-648 were drilled from the 1320-meter drill bay. To date results from 231 holes (41,188 meters) have been reported.

For a plan and section views of the reported drill fans please see the following link: http://media3.marketwire.com/docs/1049466.pdf.

The 2015/2016 infill drill program is designed to target stope areas in years one through three of the current mine plan for the Valley of the Kings. With the positive results to date, the drill program has been expanded to 64,000 meters of definition drilling. Drilling is in progress with five drills turning and is expected to be completed in the second-quarter of 2016. When completed, roughly 200 vertical meters over a strike length of 250 meters will have been drilled at 7.5 to 10-meter centers. Assay results from drilling will continue to be reported as they are received.

Table 1: Selected Valley of the Kings Drill Results, April 2016 (VU-580 to VU-653)(1,2,3)

-----------------------------------------------------------------------
-
   Hole     Dip/     From      To    Interval  Gold     Silver
   No.    Azimuth  (meters) (meters) (meters)  (g/t)    (g/t)   Comments
------------------------------------------------------------------------
        1310-meter Drill Bay - 426,522E/6,258,139N - 192 Azimuth
------------------------------------------------------------------------
  VU-580  -32/192   134.00   135.00    1.00    13.55    28.90
------------------------------------------------------------------------
                    163.00   164.00    1.00    31.10    44.20
------------------------------------------------------------------------
  VU-583  -27/192    0.00     1.00     1.00    259.00   126.00
------------------------------------------------------------------------
  VU-588  -22/192   203.00   203.50    0.50    14.80     12.5
------------------------------------------------------------------------
                    241.20   249.00    7.80    17.78    18.64
------------------------------------------------------------------------
            incl    242.41   243.31    0.90    101.00   98.80
------------------------------------------------------------------------
            incl    247.90   248.40    0.50    60.50    10.70
------------------------------------------------------------------------
  VU-594  -17/192   48.00    48.93     0.93     5.94    227.00
------------------------------------------------------------------------
  VU-600  -12/192   179.20   192.88   13.68    12.26     9.29
------------------------------------------------------------------------
            incl    180.35   180.85    0.50    14.70    17.70
------------------------------------------------------------------------
            incl    192.38   192.88    0.50    295.00   122.00
------------------------------------------------------------------------
  VU-605   -7/192   119.00   120.00    1.00    10.45     12.2
------------------------------------------------------------------------
  VU-612   -2/192   130.00   132.00    2.00    14.47     9.60
------------------------------------------------------------------------
            incl    130.00   131.00    1.00    26.00     12.6
------------------------------------------------------------------------
  VU-617   3/192     4.20     4.70     0.50    113.00   145.00
------------------------------------------------------------------------
                    90.95    111.00   20.05    11.30    16.84
------------------------------------------------------------------------
            incl    90.95    91.45     0.50    20.00    21.30
------------------------------------------------------------------------
            incl    109.75   110.25    0.50    406.00   521.00
------------------------------------------------------------------------
                    145.00   146.00    1.00    47.20    24.30
------------------------------------------------------------------------
  VU-624   8/192    99.65    100.15    0.50    12.05     5.20
------------------------------------------------------------------------
                    144.00   145.00    1.00     9.74     8.90
------------------------------------------------------------------------
        1270-meter Drill Bay - 426,663E/6,258,075N - 178 Azimuth
------------------------------------------------------------------------
  VU-595  -35/178   130.00   131.00    1.00     7.88     3.50
------------------------------------------------------------------------
                    180.00   181.00    1.00    15.35    100.00
------------------------------------------------------------------------
  VU-598  -30/178   70.00    104.00   34.00    25.32    17.42  3 samples
                                                                  cut
------------------------------------------------------------------------
             or     70.00    104.00   34.00    46.15    17.42    uncut
------------------------------------------------------------------------
            incl    94.09    94.59     0.50    665.00   265.00
------------------------------------------------------------------------
            incl    94.59    95.09     0.50    1,660    952.00
------------------------------------------------------------------------
            incl    95.09    95.59     0.50    711.00   455.00
------------------------------------------------------------------------
            incl    95.59    96.09     0.50    26.00    35.00
------------------------------------------------------------------------
                    140.00   155.00   15.00     7.72    15.13
------------------------------------------------------------------------
            incl    140.00   141.00    1.00    30.80    52.80
------------------------------------------------------------------------
            incl    152.21   152.71    0.50    114.00   44.80
------------------------------------------------------------------------
  VU-602  -20/178   123.00   126.91    3.91    12.86    10.86
------------------------------------------------------------------------
            incl    125.76   126.26    0.50    90.30    21.40
------------------------------------------------------------------------
  VU-606  -15/178   92.73    98.50     5.77    12.24    39.12
------------------------------------------------------------------------
            incl    92.73    93.23     0.50    130.00   42.00
------------------------------------------------------------------------
  VU-609  -10/178   109.00   110.00    1.00     8.47    404.00
------------------------------------------------------------------------
  VU-614   -5/178   113.00   117.77    4.77     9.85     5.76
------------------------------------------------------------------------
            incl    113.00   114.00    1.00    18.40    10.10
------------------------------------------------------------------------
            incl    117.27   117.77    0.50    45.50    18.80
------------------------------------------------------------------------
                    134.00   135.00    1.00    15.40    21.50
------------------------------------------------------------------------
                    145.78   146.28    0.50     81.2    243.00
------------------------------------------------------------------------
                    161.00   162.00    1.00    44.90    36.40
------------------------------------------------------------------------
  VU-618  2.5/178   86.50    87.00     0.50     30.9    15.90
------------------------------------------------------------------------
        1320-meter Drill Bay - 426,586E/6,258,093N - 194 Azimuth
------------------------------------------------------------------------
  VU-587  -50/194   50.00    51.08     1.08     8.89    11.40
------------------------------------------------------------------------
  VU-592  -45/194   72.00    100.00   28.00    16.08    37.90   1 sample
                                                                  cut
------------------------------------------------------------------------
             or     72.00    100.00   28.00    37.87    37.90    uncut
------------------------------------------------------------------------
            incl    78.90    79.40     0.50    264.00   207.00
------------------------------------------------------------------------
            incl    79.90    80.40     0.50    21.40    17.70
------------------------------------------------------------------------
            incl    83.60    84.10     0.50    1,760    1,065
------------------------------------------------------------------------
                    127.00   128.00    1.00    51.30    12.10
------------------------------------------------------------------------
                    191.00   193.00    2.00    20.05    16.90
------------------------------------------------------------------------
  VU-596  -40/194   82.00    95.00    13.00    10.00    15.92
------------------------------------------------------------------------
            incl    86.00    87.00     1.00    97.90    61.20
------------------------------------------------------------------------
  VU-601  -35/194   95.00    96.00     1.00    13.15     9.50
------------------------------------------------------------------------
  VU-604  -30/194   139.00   140.00    1.00    25.50    63.50
------------------------------------------------------------------------
                    154.28   155.00    0.72     8.90    44.70
------------------------------------------------------------------------
  VU-607  -25/194   23.00    24.00     1.00    196.00   35.60
------------------------------------------------------------------------
  VU-610  -20/194   151.21   156.00    4.79     7.90    90.01
------------------------------------------------------------------------
            incl    152.00   153.00    1.00    15.90    17.70
------------------------------------------------------------------------
  VU-613  -15/194   90.35    104.00   13.65    18.39    25.91
------------------------------------------------------------------------
            incl    90.35    90.85     0.50    47.40    36.30
------------------------------------------------------------------------
            incl    103.00   104.00    1.00    222.00   295.00
------------------------------------------------------------------------
                    148.00   149.00    1.00    19.20    11.90
------------------------------------------------------------------------
  VU-616  -10/194   107.00   117.00   10.00    23.73    17.03
------------------------------------------------------------------------
            incl    108.00   108.83    0.83    272.00   162.00
------------------------------------------------------------------------
     1260-meter South Drill Bay - 426,529E/6,258,018N - 180 Azimuth
------------------------------------------------------------------------
  VU-608  -39/180   24.00    30.00     6.00    18.58    30.03
------------------------------------------------------------------------
            incl    29.00    30.00     1.00    99.80    99.60
------------------------------------------------------------------------
  VU-611  -32/180   21.41    22.01     0.60     9.86    36.40
------------------------------------------------------------------------
                    126.00   127.14    1.14     9.88    12.60
------------------------------------------------------------------------
  VU-615  -25/180   19.19    19.69     0.50    191.50   97.00
------------------------------------------------------------------------
  VU-625  -10/180   17.00    18.00     1.00    17.70    20.20
------------------------------------------------------------------------
  VU-628   -3/180   42.15    42.65     0.50    13.70     6.30
------------------------------------------------------------------------
                    87.00    88.00     1.00     7.77    17.50
------------------------------------------------------------------------
  VU-630   3/180    85.00    86.00     1.00     6.49    20.40
------------------------------------------------------------------------
        1320-meter Drill Bay - 426,586E/6,258,093N - 200 Azimuth
------------------------------------------------------------------------
  VU-619 -47.5/200  128.38   155.00   26.62    10.67    14.20   1 sample
                                                                  cut
------------------------------------------------------------------------
             or     128.38   155.00   26.62    16.21    14.20    uncut
------------------------------------------------------------------------
            incl    128.38   128.88    0.50    835.00   484.00
------------------------------------------------------------------------
  VU-622 -42.5/200  90.00    92.15     2.15    11.18    10.16
------------------------------------------------------------------------
            incl    91.65    92.15     0.50    25.20    18.90
------------------------------------------------------------------------
                    138.46   148.00    9.54    30.92    84.66   1 sample
                                                                  cut
------------------------------------------------------------------------
             or     138.46   148.00    9.54    77.30    84.66    uncut
------------------------------------------------------------------------
            incl    138.46   138.96    0.50    1,425    1,400
------------------------------------------------------------------------
  VU-627 -37.5/200  29.00    30.00     1.00    14.20     6.60
------------------------------------------------------------------------
  VU-631 -32.5/200  92.00    96.00     4.00    19.49     9.66
------------------------------------------------------------------------
            incl    94.24    94.74     0.50    147.00   33.80
------------------------------------------------------------------------
  VU-635 -27.5/200  95.00    96.00     1.00    14.80     4.90
------------------------------------------------------------------------
                    105.00   106.00    1.00    15.30    18.10
------------------------------------------------------------------------
  VU-643 -17.5/200  101.90   108.00    6.10     9.01     8.78
------------------------------------------------------------------------
                    101.90   102.40    0.50    66.50    35.10
------------------------------------------------------------------------
                    107.00   108.00    1.00    16.00     5.70
------------------------------------------------------------------------
  VU-648 -12.5/200  82.19    99.32    17.13    19.88    43.83   1 sample
                                                                  cut
------------------------------------------------------------------------
             or     82.19    99.32    17.13    40.46    43.83    uncut
------------------------------------------------------------------------
            incl    82.19    82.69     0.50    1,245    1,290
------------------------------------------------------------------------
            incl    98.82    99.32     0.50    101.50   43.20
------------------------------------------------------------------------
     1260-meter South Drill Bay - 426,529E/6,258,018N - 190 Azimuth
------------------------------------------------------------------------
  VU-633  -32/190   148.00   162.00   14.00    31.65    217.04  1 sample
                                                                  cut
------------------------------------------------------------------------
             or     148.00   162.00   14.00    428.43   217.04   uncut
------------------------------------------------------------------------
            incl    156.80   157.30    0.50    335.00   68.00
------------------------------------------------------------------------
            incl    157.80   158.30    0.50    11,650   5,980
------------------------------------------------------------------------
  VU-637  -25/190   26.10    34.00     7.90     5.43    32.45
------------------------------------------------------------------------
            incl    26.90    27.40     0.50    24.60    25.50
------------------------------------------------------------------------
            incl    33.00    34.00     1.00    18.45    42.70
------------------------------------------------------------------------
                    56.00    84.85    28.85    11.08    21.79   1 sample
                                                                  cut
------------------------------------------------------------------------
             or     56.00    84.85    28.85    26.16    21.79    uncut
------------------------------------------------------------------------
            incl    56.00    56.50     0.50    1,410    758.00
------------------------------------------------------------------------
            incl    60.00    61.00     1.00    15.85    16.70
------------------------------------------------------------------------
            incl    84.35    84.85     0.50    13.90     8.80
------------------------------------------------------------------------
  VU-642  -18/190   30.45    45.00    14.55    10.86    13.82
------------------------------------------------------------------------
            incl    30.45    30.95     0.50    199.00   127.00
------------------------------------------------------------------------
            incl    40.00    41.00     1.00    24.50    24.50
------------------------------------------------------------------------
            incl    43.90    45.00     1.10    18.85    16.30
------------------------------------------------------------------------
  VU-645  -10/190   29.00    30.00     1.00    25.10    16.50
------------------------------------------------------------------------
                    59.00    81.00    22.00    29.96    14.80
------------------------------------------------------------------------
            incl    60.62    61.12     0.50    172.50   200.00
------------------------------------------------------------------------
            incl    79.00    80.00     1.00    544.00   95.20
------------------------------------------------------------------------
  VU-649   -3/190   100.00   101.00    1.00    18.65    11.00
------------------------------------------------------------------------
                    133.00   134.00    1.00    10.65     7.00
------------------------------------------------------------------------
  VU-653   4/190    76.00    79.00     3.00     6.18    13.10
------------------------------------------------------------------------
(1) True thickness to be determined.
(2) Unless otherwise indicated as uncut, all gold assays over 540 g/t were
    cut to 540 g/t.
(3) All samples were submitted for preparation and analysis by ALS Chemex at
    its facilities in Terrace, B.C. All samples were analyzed using multi-
    digestion with ICP finish and fire assay with AA finish for gold.
    Samples over 100 ppm silver were reanalyzed using four acid digestion
    with an ore grade AA finish. Samples over 1,500 ppm silver were fire
    assayed with a gravimetric finish. Samples with over 10 ppm gold were
    fire assayed with a gravimetric finish. One in 20 samples was blank, one
    in 20 was a standard sample, and one in 20 samples had a sample cut from
    assay rejects assayed as a field duplicate at ALS Chemex in North
    Vancouver, B.C. Whole core (core not split) is being assayed as part of
    the underground infill drill program.

Kenneth C. McNaughton, M.A.Sc., P.Eng., Chief Exploration Officer, Pretium Resources Inc. is the Qualified Person (QP) responsible for the Brucejack Project exploration program.

About Pretivm

Pretivm is constructing a high-grade underground gold mine at its Brucejack Project in northern British Columbia with commercial production targeted for 2017.

(SEDAR filings: Pretium Resources Inc.)

Forward-Looking Statements

This News Release contains "forward-looking information" and "forward looking statements" within the meaning of applicable Canadian and United States securities legislation. Statements contained herein that are not based on historical or current fact, including without limitation statements containing the words "anticipates," "believes," "may," "continues," "estimates," "expects," and "will" and words of similar import, constitute "forward-looking statements" within the meaning of the U.S. Private Securities Litigation Reform Act of 1995. Forward-looking information may include, but is not limited to, information with respect to our planned exploration and development activities, the adequacy of Pretivm's financial resources, the estimation of mineral reserves and resources including the 2013 Valley of the Kings Mineral Resource estimate and the Brucejack Mineral Reserve estimate, realization of mineral reserve and resource estimates and timing of development of Pretivm's Brucejack Project, costs and timing of future exploration, results of future exploration and drilling, production and processing estimates, capital and operating cost estimates, timelines and similar statements relating to the economic viability of the Brucejack Project, timing and receipt of approvals, consents and permits under applicable legislation, Pretivm's executive compensation approach and practice, and adequacy of financial resources. Wherever possible, words such as "plans", "expects", "projects", "assumes", "budget", "strategy", "scheduled", "estimates", "forecasts", "anticipates", "believes", "intends", "targets" and similar expressions or statements that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative forms of any of these terms and similar expressions, have been used to identify forward-looking statements and information.

Statements concerning mineral reserve and resource estimates may also be deemed to constitute forward-looking information to the extent that they involve estimates of the mineralization that will be encountered if the property is developed. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance are not statements of historical fact and may be forward-looking information. Forward-looking information is subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied by the forward-looking information, including, without limitation, those risks identified in Pretivm's Annual Information Form dated March 28, 2016 filed on SEDAR at www.sedar.com and in the United States on Form 40-F through EDGAR at the SEC's website at www.sec.gov. Forward-looking information is based on the expectations and opinions of Pretivm's management on the date the statements are made. The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise. We do not assume any obligation to update forward-looking information, whether as a result of new information, future events or otherwise, other than as required by applicable law. For the reasons set forth above, prospective investors should not place undue reliance on forward-looking information. Neither the TSX nor the NYSE has approved or disapproved of the information contained herein.

Contacts:
Pretium Resources Inc.
Joseph Ovsenek
President

Pretium Resources Inc.
Troy Shultz
Manager, Investor Relations & Corporate Communications
(604) 558-1784
(877) 558-1784
invest@pretivm.com


SOURCE: Pretium Resources Inc.

Share
New Message
Please login to post a reply