Just a reminder, as was reiterated to me by PEM recently: PEM's strategy for Phase 4 is to determine the length of the Friday Fault which is why PEM is stepping out 550 meters and more, geophysics suggest it could 3-4 times the existing strike length! Once the company finds the end of it then they will go back and start drilling infill holes to increase the resource. There are two drills on Deadwood because the geophysics suggest it has a bigger footprint than Friday-Petsite. Phase 4 is an exploration drill program to cover the entire Orogrande Shear Zone.