Did anyone wonder if both the Buffalo Gulch holes were drilled to the requirement for Premium to use both for model purposes? With 7 holes on Friday drilled to app. 400m each and two holes on Buffalo Gulch to app. 165m each, did the BLM due to snow and mud along with possible road damage ask Premium to stop immediately while drilling the second hole? The answer to this is that only the first hole was drilled into the IP structure and completed and can be used for the model purposes with the second hole partially complete and currently on hold till BLM approval.
Thanks to team for clarification, Joe.