so what does Suresh mean by everything on track then? Which presentation schedule is valid, the 2022 Aug or Oct?
Last I checked it said FR4 Tx OE 400/800G for production 2023 H2
https://twitter.com/POETtech/status/1624982044441821184?t=LuGolHWH1eJUvF_rGUNFhA&s=19