Re: Black Hole.....I now stand corrected
posted on
Sep 17, 2014 10:41PM
Last thing. Once the fab is a done deal and in GF's hands (October 21 ish) then they can let they can let the "third party fab be named and let the car out of the bag stating that POET can be built in the existing IBM fab with minimal changes to existing equipment. Talk about hitting the ground running!! Now this is really exciting. This is the perfect scenario when absolute secrecy is required. Otherwise IBM may have caught wind of POETs fab requirments and shut the deal down. Cudos mgt. My hat is off. Derekwpg