New Drill Results and Historical Core Reassays From Copperwood Project
posted on
Feb 13, 2009 05:02AM
Operations: Copper-gold-silver-mine in Bolivia, Gold/copper mine/Mill in Spain and its developing copper project in Michigan
February 13, 2009 | ||
Orvana Reports New Drill Results and Historical Core Reassays From Copperwood Project, Michigan | ||
TORONTO, ONTARIO--(Marketwire - Feb. 13, 2009) - Orvana Minerals Corp. (TSX:ORV) is pleased to announce assay results from five of six new drill holes that were targeted to intersect the copper-bearing lithologic section at its Copperwood Project, located on the south limb of the Western Syncline, Michigan. These holes were a part of a 20-hole program that was designed to monitor groundwater, as reported in the February 11, 2009 Orvana press release. A summary of the results is as follows:--------------------------------------------------------- From To Interval Cu Ag Hole (Feet) (Feet) (Feet) % ppm --------------------------------------------------------- --------------------------------------------------------- CW-08-09 124.10 135.35 11.25 1.52 3.0 CW-08-13 449.65 460.35 10.70 2.21 6.9 CW-08-16 668.30 678.30 10.00 2.24 6.4 CW-08-17 538.80 549.30 10.50 1.82 4.2 CW-08-20 310.75 321.00 10.25 1.66 2.9 --------------------------------------------------------- --------------------------------------------------------- All the holes were drilled vertical into stratiform mineralization that dips approximately 10-15 degrees. Recoveries were 100%. The stratiform copper deposit at Copperwood is hosted by shales and siltstones of the Nonesuch Formation and is analogous to the mineralization exploited at the inactive White Pine mine located 18 miles to the northeast. Bill Williams, Vice President of Corporate Development, said, "The results from our new drilling and the resampling of core from historical drilling confirm our belief that the results from the 1950s program are reliable. We are now even more confident of the thickness and grade of the mineralization defined previously by historical drilling." Orvana has engaged AMEC E & C Services Inc. of Phoenix, Arizona to audit the core handling and sampling protocol, definitively assess whether the historical data is valid, aid in the design of the upcoming delineation drill program, and ultimately estimate mineral resources with the expectation of achieving measured and indicated confidence categories by year end. Table 1. Comparison of historical and current results. ---------------------------------------------------------------------------- From From Interval Historic Cu Ag Hole (Feet) (Feet) (Feet) Cu, % % ppm ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- M57-W48 530.35 534.04 3.69 0.05 0.02 less than 0.2 M57-W48 534.04 537.61 3.57 1.51 0.13 0.2 M57-W48 537.61 541.15 3.54 1.53 0.12 0.2 M57-W48 541.15 542.54 1.39 0.61 0.23 0.4 M57-W48 542.54 543.54 1.00 0.20 0.84 0.8 M57-W48 543.54 544.54 1.00 0.46 0.34 0.6 M57-W48 544.54 545.30 0.76 0.38 0.67 2.2 M57-W48 545.30 546.36 1.06 0.67 0.63 0.9 M57-W48 546.36 548.12 1.76 1.79 1.79 28.9 M57-W48 548.12 548.83 0.71 1.08 1.19 1.4 M57-W48 548.83 550.34 1.51 0.15 0.16 3.7 ---------------------------------------------------------------------------- M57-W52 371.66 374.69 3.03 0.23 0.21 0.5 M57-W52 374.69 375.69 1.00 0.87 0.26 0.7 M57-W52 375.69 376.69 1.00 0.59 0.82 2.1 M57-W52 376.69 378.57 1.88 1.95 1.98 3.9 M57-W52 378.57 379.72 1.15 1.00 0.83 1.8 M57-W52 379.72 381.57 1.85 0.26 0.26 0.8 M57-W52 381.57 386.07 4.50 1.64 2.48 3.0 M57-W52 386.07 387.07 1.00 0.02 0.01 4.0 ---------------------------------------------------------------------------- M57-W58 355.25 356.95 1.70 0.07 0.05 2.7 M57-W58 356.95 357.95 1.00 1.64 0.67 11.3 M57-W58 357.95 358.95 1.00 1.02 1.03 10.1 M57-W58 358.95 360.05 1.10 2.56 2.53 19.5 M57-W58 360.05 361.11 1.06 1.23 1.22 6.9 M57-W58 361.11 362.80 1.69 0.38 0.32 1.3 M57-W58 362.80 365.00 2.20 3.89 4.59 14.1 M57-W58 365.00 369.10 4.10 2.38 3.19 4.0 M57-W58 369.10 369.80 0.70 0.04 0.01 5.5 ---------------------------------------------------------------------------- M57-W64 519.00 520.40 1.40 0.28 0.05 1.6 M57-W64 520.40 521.00 0.60 0.57 0.52 6.7 M57-W64 521.00 523.12 2.12 1.63 2.08 13.0 M57-W64 523.12 524.15 1.03 0.59 0.49 1.8 M57-W64 524.15 529.15 5.00 2.65 3.40 6.3 M57-W64 529.15 531.09 1.94 0.26 0.30 4.1 ---------------------------------------------------------------------------- M57-W109 207.02 208.60 1.58 0.17 0.47 1.6 M57-W109 208.60 209.41 0.81 0.77 0.76 3.4 M57-W109 209.41 210.51 1.10 0.69 0.63 1.9 M57-W109 210.51 211.10 0.59 0.34 0.31 1.2 M57-W109 211.10 211.93 0.83 2.15 2.60 7.6 M57-W109 211.93 212.66 0.73 1.91 2.17 5.4 M57-W109 212.66 213.14 0.48 1.39 1.44 3.6 M57-W109 213.14 213.46 0.32 0.62 0.54 1.6 M57-W109 213.46 214.30 0.84 4.95 5.43 12.4 M57-W109 214.30 215.63 1.33 1.30 1.32 2.7 M57-W109 215.63 218.63 3.00 1.72 1.79 3.0 M57-W109 218.63 220.00 1.37 0.10 0.08 1.8 ---------------------------------------------------------------------------- M57-W116 121.55 123.92 2.37 0.14 0.13 0.5 M57-W116 123.92 125.67 1.75 0.30 0.31 1.1 M57-W116 125.67 127.93 2.26 0.51 0.47 1.7 M57-W116 127.93 128.46 0.53 2.01 2.00 5.3 M57-W116 128.46 130.87 2.41 0.69 0.80 2.2 M57-W116 130.87 132.40 1.53 0.35 0.34 0.9 M57-W116 132.40 137.78 5.38 2.11 2.30 4.4 M57-W116 137.78 139.33 1.55 0.01 0.01 0.9 ---------------------------------------------------------------------------- Security measures were taken to ensure the integrity and validity of the mineralization and proximal rocks in the new drill core. The core was sampled based on the lithostratigraphy established by the Copperwood geologic team. Assays were completed by Activation Laboratories Ltd., an ISO/IEC 17025 and CAN-P-1579 registered laboratory. The QA/QC protocol included internal and laboratory standards and blanks. AR-ICP values were determined using an agua regia extraction with an ICP/OES finish. Assay values were determined for samples with Cu greater than 1000 ppm also using an agua regia extraction with an ICP/OES finish. Maps, cross-sections, handling and sampling protocols, QA/QC, statistical evaluations, and photographs are available on Orvana's website at www.orvana.com. Theodore Bornhorst, Ph.D., P. Geo., a consultant to Orvana and a qualified person as defined in National Instrument 43-101 -- Standards of Disclosure for Mineral Projects, has reviewed, verified and approved the scientific and technical content of this news release. About Orvana Orvana Minerals Corp. is a Canadian mining and exploration company based in Toronto, Canada, involved in the evaluation, development and mining of precious and base metal deposits in the Americas. The Company owns and operates the Don Mario Mine in eastern Bolivia. Orvana's long-term goal is to become a low cost, long-life, multi-mine gold and base metals producer in the Americas. Orvana's shares have been listed on the Toronto Stock Exchange since 1992 under the trading symbol ORV. Further information on Orvana may be found on the Company's website at www.orvana.com and on SEDAR at www.sedar.com. |