Welcome To The Orko Silver HUB On AGORACOM

124 million oz Silver Equivalent

Free
Message: Drills 3.99 Metres of 1 Kilogram Per Ton Silver Equivalent

Drills 3.99 Metres of 1 Kilogram Per Ton Silver Equivalent

posted on Dec 03, 2008 01:00AM
December 2, 2008
Orko Silver Drills 3.99 Metres of 1 Kilogram Per Ton Silver Equivalent
VANCOUVER, BRITISH COLUMBIA--(Marketwire - Dec. 2, 2008) - Orko Silver Corp. (TSX VENTURE:OK) is pleased to announce that it has received further assay results from its on-going diamond drilling program at La Preciosa Project in Durango, Mexico.

Of particular note is a thick, high-grade intercept for the Martha Vein in hole BP08-280. This hole is located on the eastern side of the mineralized trend. Hole BP08-280 yielded a true thickness of 6.74 metres grading 1.111 g/t gold and 561.6 g/t silver for a silver-equivalent of 628.2 g/t. Within this intercept is 3.99 metres grading 1.822 g/t gold and 927.4 g/t silver for a silver-equivalent of 1,036.7 g/t.

Also of interest is hole BP08-278 which yielded 5.10 metres grading 1.004 g/t gold and 251.3 g/t silver for a silver-equivalent of 311.5 g/t and hole BP08-325A (a re-drill of hole BP08-325, which was abandoned during drilling) yielded 6.47 metres grading 0.860 g/t gold and 421.5 g/t silver for a silver-equivalent of 473.1 g/t.

Gary Cope, President of Orko, adds: "We are particularly pleased with the results of Hole 280. It represents another in a long list of holes at La Preciosa that have yielded a significant intercept over 1 kilogram per ton Silver Equivalent. Holes 278, 280 and 325A were noteworthy not only for their impressive grades and widths but also because the high grade mineralization was encountered at a relatively shallow depth. Although we encountered a low grade section of the Martha Vein in some of the holes reported, which is typical in Mexican Epithermal Vein Systems, the vein is structurally strong and we anticipate encountering better grade mineralization with progression to the southeast."

Key Martha Vein intercepts added for this release:

--------------------------------------------------------------------------
               From        To     Core     True       Au       Ag    Ag-Eq
Vein        (metres)  (metres)  Length    Width     (g/t)    (g/t)    (g/t)
--------------------------------------------------------------------------
BP05-238     325.33    327.36     2.03     2.00    0.250    138.6    153.7
--------------------------------------------------------------------------
BP08-239     338.27    347.94     9.67     9.63    0.443    125.4    152.0
--------------------------------------------------------------------------
BP08-251     307.10    309.33     2.23     2.19    0.095    100.0    105.7
--------------------------------------------------------------------------
BP08-252     341.63    345.88     4.25     4.19    0.104    147.0    153.3
--------------------------------------------------------------------------
BP08-262     188.55    190.61     2.06     2.03    0.034    166.0    168.1
--------------------------------------------------------------------------
BP08-264     254.19    260.95     6.76     6.35    0.285    147.6    164.7
--------------------------------------------------------------------------
BP08-267     163.07    165.32     2.25     2.24    0.198     90.1    102.0
--------------------------------------------------------------------------
BP08-268     161.90    164.22     2.32     2.24    0.183     97.8    108.8
--------------------------------------------------------------------------
BP08-277     109.60    112.95     3.35     3.30    0.218    247.1    260.2
--------------------------------------------------------------------------
BP07-278      83.63     89.06     5.43     5.10    1.004    251.3    311.5
--------------------------------------------------------------------------
BP08-280      46.77     53.61     6.84     6.74    1.111    561.6    628.2
--------------------------------------------------------------------------
BP08-287      93.41     98.16     4.75     4.46    0.198    226.5    238.4
--------------------------------------------------------------------------
BP08-288      57.17     62.54     5.37     4.87    0.183    208.3    219.3
--------------------------------------------------------------------------
BP08-299     214.00    228.26    14.26    13.40    0.151    159.3    168.4
--------------------------------------------------------------------------
BP08-300     170.20    179.01     8.81     8.68    0.321    137.1    156.4
--------------------------------------------------------------------------
BP08-312      75.23     83.04     7.81     7.69    0.441    148.2    174.7
--------------------------------------------------------------------------
BP08-324     182.27    189.76     7.49     6.49    0.098    103.5    109.4
--------------------------------------------------------------------------
BP08-325     114.47    120.81     6.34     6.24    0.301    359.5    377.6
--------------------------------------------------------------------------
BP08-325A    117.42    123.89     6.47     6.37    0.860    421.5    473.1
--------------------------------------------------------------------------
Several holes were either drilled along the periphery of the main mineralized trend in Martha or do not make either the thickness, or the cut-off grade, requirements for the Martha vein. These include: BP08-196, BP08-234, BP08-237, BP08-241, BP08-246, BP08-248, BP08-249, BP08-250, BP08-255, BP08-256, BP08-257, BP08-258, BP08-259, BP08-260, BP08-261, BP08-263, BP08-265, BP08-266, BP08-271, BP08-274, BP08-275, BP08-276, BP08-285, BP08-290, BP08-291, BP08-293, BP08-294, BP08-295, BP08-296, BP08-297, BP08-298, BP08-301, BP08-302, BP08-303, BP08-304, BP08-305, BP08-306 and BP08-311. Hole BP08-282 did not reach the target depth.

A complete table of drill results is available on our website at the link below:

http://www.orkosilver.com/i/pdf/dril...

A detailed drill plan map is available on our website at the link below:

http://www.orkosilver.com/i/pdf/dril...

A printer friendly PDF format of this news release is available at the link below:

http://www.investorhub.ca/orkonews12...

Ben Whiting, P.Geo., is the Qualified Person and takes responsibility for the technical disclosure in this news release. Full details of the Company's sampling protocols and QA/QC program can be located on our website at the link below:

http://www.orkosilver.com/s/QAQC.asp

Silver-equivalent for the purposes of this drilling program is defined as silver grade plus 60 times gold grade. Metallurgical recoveries and net smelter returns are assumed to be 100% for the silver-equivalent value. Base metal values are not included in the silver-equivalent.

About Orko Silver Corp.

Orko Silver Corp. is a professional exploration company with an increasing silver resource. Orko Silver's principal project, La Preciosa, located near the city of Durango, Mexico, is an advanced silver and gold project. The Company is currently drilling at La Preciosa, working 24 hours a day, 7 days a week. The deposit remains open in all directions and to depth. Two additional projects include the Santa Monica east of La Preciosa and the San Juan west of La Preciosa.

ON BEHALF OF THE BOARD OF DIRECTORS

Gary Cope, President
Share
New Message
Please login to post a reply