Temex, Nuinsco drill 3.9 m of 1,510 ppm U at Huston
2009-02-26 14:49 EST - News Release
See News Release (C-TME) Temex Resources Corp
Mr. Ian Campbell of Temex reports
TEMEX AND NUINSCO REPORT DRILL RESULTS - MARIJANE AND HUSTON LAKE PROPERTIES
Temex Resources Corp. and partner Nuinsco Resources Ltd. have received analytical results from a 12-hole, 1,386-metre diamond drill program that was conducted on the Marijane Lake and Huston Lake uranium properties in December, 2008.
The program, which was financed by Nuinsco, tested targets within three distinct radiometric anomaly areas identified from a helicopter-borne radiometric and magnetic geophysical survey flown in May, 2008.
Anomalous uranium mineralization greater than 100 parts per million U was reported in seven out of 12 holes.
Ten holes were drilled on the Huston Lake property, nine of which tested a five-kilometre-long airborne radiometric anomaly from which follow-up prospecting had returned up to 3,240 ppm U from grab samples of felsic dikes and/or sills interpreted to be apophyses of the uranium-bearing Marijane Lake batholith.
Six of the holes returned anomalous uranium mineralization with the most significant results reported being from drill hole THL-08-01, which returned 1,170 ppm U and 1,510 ppm U within an interval of 663 ppm U over 3.90 metres and drill hole THL-08-03 which returned 164 ppm U over 10.30 metres.
Hg