Focusing on Bissett Creek Flake Graphite Deposit

Recently announced significant increase in estimated resources

Free
Message: Scissors Summary on SH

There is a very nice summary on SH from poster Scissors14. 7 July 2012. Link

http://www.stockhouse.com/Bullboards/MessageDetail.aspx?s=NGC&t=LIST&m=31252232&l=0&pd=1&r=0#

If the link does not launch, try copy and paste. If this does not work then try to access SH directly (V.NGC).

Among other things, he post shows a link to a firm, Gmining

http://gmining.com/?page_id=36&lang=en

which mentions an interesting tit bit...Gmining was hired to

" Manage the supply of natural gas to the project" (for NGC). NGC Bissett Creek project is about 17km from the Trans Canada Highway, the power corridor and the main natural gas line. It is understood that NGC plans to use natural gas to produce electricity and heat (for drying) for the Bissett Creek site.

Natural gas is cleaner (brownie point for environment review), cheaper and can be used to combined electric power and heat generation for drying the graphite. This would save quite a bit of money for the processing operation. It's also possible to rent the equipments as part of the cost reduction of the capex.

goldhunter

Share
New Message
Please login to post a reply