Message: How Long Would it Take to Install a Rail Veyor System to the Ring?
 
I wonder how long it would take to install a track 330 kim long with a crew of more than 50 - 100 workers? Seeing as how a crew of 6 men can install 120 feet / hour.
If they can manage more than a km / day then perhaps they can install it within a year's time.
Food for thought.
TM.
 
 
 
Rail-Veyor® McCall Loop

To discharge materials, cars are inverted into a continuous loop that can be run 180 or 360-degrees, easily unloading into a stockpile, bin or crusher.

Rail-Veyor® Topography

The Rail-Veyor system is proven to work on grades up to 30%.

Rail-Veyor® Track System

Lighter and smaller steel ties install quickly and accurately, and rails are simply bolted together with joint bars and bolts. In fact, a six-person crew can install 120 feet of track per hour.