HIGH-GRADE NI-CU-PT-PD-ZN-CR-AU-V-TI DISCOVERIES IN THE "RING OF FIRE"

NI 43-101 Update (September 2012): 11.1 Mt @ 1.68% Ni, 0.87% Cu, 0.89 gpt Pt and 3.09 gpt Pd and 0.18 gpt Au (Proven & Probable Reserves) / 8.9 Mt @ 1.10% Ni, 1.14% Cu, 1.16 gpt Pt and 3.49 gpt Pd and 0.30 gpt Au (Inferred Resource)

Free
Message: Ot; ROF related.Marten Falls Delegation Review Railroad Feasibility Study at China Railway First Survey & Design Institute With KWG

"...In the early 1880s, it took Canada less than five years to build the Canadian Pacific railway from Ontario to Vancouver – a distance of roughly 4,200 kilometres. The distance between the Ring of Fire and the provincial highway system is about 280 kilometres...."

 http://mpda.ca/wp-content/uploads/2016/03/a-Ring-of-Fire-PDF.pdf

Share
New Message
Please login to post a reply