HIGH-GRADE NI-CU-PT-PD-ZN-CR-AU-V-TI DISCOVERIES IN THE "RING OF FIRE"

NI 43-101 Update (September 2012): 11.1 Mt @ 1.68% Ni, 0.87% Cu, 0.89 gpt Pt and 3.09 gpt Pd and 0.18 gpt Au (Proven & Probable Reserves) / 8.9 Mt @ 1.10% Ni, 1.14% Cu, 1.16 gpt Pt and 3.49 gpt Pd and 0.30 gpt Au (Inferred Resource)

Free
Message: re..road

I would think that the road would have top priority. It would enable the hydro line to get built as well as construction of the mine(s). they cant ship ore until the mine is built and the hydro is in place. And if necesary the can ship ore by road....buy...buy...buy...hold...hold...hold.

Share
New Message
Please login to post a reply