HIGH-GRADE NI-CU-PT-PD-ZN-CR-AU-V-TI DISCOVERIES IN THE "RING OF FIRE"

NI 43-101 Update (September 2012): 11.1 Mt @ 1.68% Ni, 0.87% Cu, 0.89 gpt Pt and 3.09 gpt Pd and 0.18 gpt Au (Proven & Probable Reserves) / 8.9 Mt @ 1.10% Ni, 1.14% Cu, 1.16 gpt Pt and 3.49 gpt Pd and 0.30 gpt Au (Inferred Resource)

Free
Message: Dolphin ....
Freezing is not the problem. They are burrying the pipe and they will insulate it, I suspect.

I see it as impractical due to piping then trucking before smelting. Due to sheer logistics, therefore cost.

Once the rail line is in it should be the most cost effective and replaces the need for piping.

Share
New Message
Please login to post a reply