WE Have:
"In October 2008, P&E Mining Consultants estimated a combined Indicated and Inferred resource for the Eagle One (Eagle 1A) lens of 2.9 M tonnes averaging 2.1% Ni, 1.2% Cu, 1.2 g/tonne Pt, 4.1 g/t Pd and 4.0 g/tonne Ag"
NOW we added to Eagle 1A:
Eagle 1B (the first lens) located vertically under Eagle 1A returned;
- 178.8 metres averaging 1.2% Ni, 0.5% Cu, 0.9 g/tonne Pt,
2.0 g/tonne Pd from 306.7 meters to 485.5 meters including;
- 2.0 metres averaging 2.5% Ni, 2.0% Cu, 0.4 g/tonne Pt,
4.7 g/tonne Pd
- 4.7 metres averaging 5.3% Ni, 1.3% Cu, 0.6 g/tonne Pt,
5.3 g/tonne Pd
Eagle 1C (the second lens) also located vertically under Eagle 1A and
directly under Eagle 1B returned;
- 149.5 metres averaging 2.4% Ni, 1.1% Cu, 1.0 g/tonne Pt,
5.1 g/tonne Pd from 796.2 metres to 945.7 metres including;
- 23.7 metres averaging 5.2% Ni, 1.0% Cu, 0.2 g/tonne Pt,
7.9 g/tonne Pd
- 21.0 metres averaging 2.5% Ni, 1.0% Cu, 0.4 g/tonne Pt,
5.3 g/tonne Pd
more to come, the train just stopped to pick up more passengers....ALL ABOARD!