HIGH-GRADE NI-CU-PT-PD-ZN-CR-AU-V-TI DISCOVERIES IN THE "RING OF FIRE"

NI 43-101 Update (September 2012): 11.1 Mt @ 1.68% Ni, 0.87% Cu, 0.89 gpt Pt and 3.09 gpt Pd and 0.18 gpt Au (Proven & Probable Reserves) / 8.9 Mt @ 1.10% Ni, 1.14% Cu, 1.16 gpt Pt and 3.49 gpt Pd and 0.30 gpt Au (Inferred Resource)

Free
Message: A logistical consideration for WES going forward....

A logistical consideration for WES going forward....

posted on Jun 28, 2009 01:12PM

As it's hopefull soon that we'll get the announcement of transition to production in regards to the eventual extraction of E1 Nickel,

Some time ago i posted a jpg. showing the close proximity of E1 to the Camp. This is an issue going forward and to move forward imo the camp is going to need to be moved to a much safer nearby location, the ongoing work on the permanent airstrip should also include pad construction in anticipation of moving camp to facilitate production extraction of the Nickel resource. Even with the utilization of blast mats, camps way too close.

Share
New Message
Please login to post a reply