Re: Could someone please clarify the meaning of "open"- Babjak
in response to
by
posted on
May 15, 2009 12:10PM
NI 43-101 Update (September 2012): 11.1 Mt @ 1.68% Ni, 0.87% Cu, 0.89 gpt Pt and 3.09 gpt Pd and 0.18 gpt Au (Proven & Probable Reserves) / 8.9 Mt @ 1.10% Ni, 1.14% Cu, 1.16 gpt Pt and 3.49 gpt Pd and 0.30 gpt Au (Inferred Resource)
How about High Lighting ALL the Important data in that part of the Jan. 23rd, 2009 NOT NR.
See the portion respecting AT12 and the 5.5 meters HIGH GRADE Mineralization.
Is this part of the (or another Conduit) Conduit carrying the Highly Valued Mineralization?
Why do so much Intensive drilling with 2 Drills, ALL Winter long in this area?
Also note that 70m more on Eagle1 is ~ 25 % more added to the Value there as well!
Old Joe
Here is your Jan. 23rd, 2009 NR with the 5.5 meters also placed in BOLD:
TORONTO, Jan. 23 /CNW/ - Noront Resources Ltd. ("Noront or the Company") (TSX Venture: NOT) is pleased to present assay results from its base metal exploration activities in the McFaulds Lake area of northern Ontario in the James Bay Lowlands.
As previously announced (see press release dated November 10, 2008), while testing for the north-south striking dike or conduit beneath and around the Eagle One deposit, drill hole NOT-08-44 encountered massive sulphide mineralization 70 metres vertically below holes NOT-08-28 and NOT-08-32.