HIGH-GRADE NI-CU-PT-PD-ZN-CR-AU-V-TI DISCOVERIES IN THE "RING OF FIRE"

NI 43-101 Update (September 2012): 11.1 Mt @ 1.68% Ni, 0.87% Cu, 0.89 gpt Pt and 3.09 gpt Pd and 0.18 gpt Au (Proven & Probable Reserves) / 8.9 Mt @ 1.10% Ni, 1.14% Cu, 1.16 gpt Pt and 3.49 gpt Pd and 0.30 gpt Au (Inferred Resource)

Free
Message: Break up....time well wasted.

Break up....time well wasted.

posted on Apr 16, 2009 06:07AM

I beleive that these guys are missing boat when it comes to drilling the ROF during breakup, basically they are not drilling at all, time wasted. They need to tech up and get on with the drilling at hand, the very idea that breakup is prohibiting exploration is frustrating to say the least, there are numerous ways and methods to ensure drilling and rig moves can continue in the ROF 24/7 365. Otherwise known as the RIGMAT, the rigmat has come a long way and i've seen alot of different types but the link below is by far leading edge. A couple of truck loads of these babys and they will be able to have road to and from camp to any drill in the area. http://www.allterrainroad.com/atr.pdf

If you have time download the video demonstration.

Also, i beleive we need to put into action the planning and approval process for removal of nickel from Eagle One. After all it is a 2 Billion dollar near surface deposit just waiting to be removed and processed.

Share
New Message
Please login to post a reply