HIGH-GRADE NI-CU-PT-PD-ZN-CR-AU-V-TI DISCOVERIES IN THE "RING OF FIRE"

NI 43-101 Update (September 2012): 11.1 Mt @ 1.68% Ni, 0.87% Cu, 0.89 gpt Pt and 3.09 gpt Pd and 0.18 gpt Au (Proven & Probable Reserves) / 8.9 Mt @ 1.10% Ni, 1.14% Cu, 1.16 gpt Pt and 3.49 gpt Pd and 0.30 gpt Au (Inferred Resource)

Free
Message: Blackbirds...Eagles and Drilling.

Blackbirds...Eagles and Drilling.

posted on Jan 19, 2009 07:13PM

As per the latest Gravity Anomally drill map there's 9 drill cores with pending assays from drilling before xmas shutdown, NOT 08-1G77 through NOT 08-1G85 inclusive, this drilling also adds 250 m to the overall strike length of 1450m approaching that of FWR, as the drills progress at the Blackbirds with step outs and more than likely decent if not spectaclular intercepts these 9 drill core must be getting close to being completed by INAA, now add 3 weeks or so for NOTs hole interpretation and QC program to generate enough information for news releases, they'll probalbly split the 9 into 5 and 4 and include added visuals on continued drilling with each batch just to keep the taste buds on alert.

I'am guessing and looking for drillling at BB1 to run S/SW away from FNC on 100m step outs, not to mention drilling of the land N/NE of fwr 100% claims. NOTs had some great intrercepts to date at the BBs'and continued drilling will only contribute to the lengthening of the 14km zone.

Not needs to confirm extension onto its land up N/NE to put a different perspective to area claim units persay. Once this is done and confirmation of extension is confirmed then the corporate political dynamics of the players within the chromite zone will change drastically, there will be a "clam up period" followed by a "how much am i worth period" and then a "maybe we should take a good hard look at the offer period". Will there be an incontrovertable amalgamation of zone players or will there be numerous single or block claim buyouts of which I would imagine as being just a little on the high side of expensive to say the least.

Any second now we should be getting visual notification of visuals of the drilling which has been ongoing at Eagle One both pre and post xmax shutdown. I still think the drilling below E1 was the reason for sp and vol increase past. By now we've surrounded hole 44 under, over, left, right there's been plenty of time to pound many a hole into the rock here.

Time for a damn road trip into Webequie and a couple charter flights over the ROF and into camp for a visit eh! lol. Who's with me?

Share
New Message
Please login to post a reply