Well that's right. It was very frustrating for many of us, especially after sitting with no news for awhile.
Back then most had shares in FNC as well as NOT, BMK, PRB as well as the FWR/SPQ/KWG group. We had them all coveerd and I'm sure many of you still do to this day plus a few more.
Mungal had brought out the Ghost Bridge theory so we were all wondering why the drilling did not continue there? Well they were drilling but they were proving up E1.
FNC wouldn't drill on their side and NOT seemed to ignore it on E1 side.
Speaking for myself, I was very frustrated. NOT came along and drilled 2 shallow holes as I recall to test this bridge but only went down a very few meters. Why they even bothered drilling those 2 holes and not go to depth is beyond me.
I guess finally even Peter Smith got fed up and although FNC had never drilled before, (to my knowledge), Smith started drilling. Amen to that.
The next thing we hear is that NOT and FNC are hammering the area from both sides of the line. More good stuff.
Then we hear that FNC has moved up to the North end. I bet they hit Chromite.
Then guess what? We find another anomaly below E1. We sure took a long way around that one didn't we?
What I would like to see are some more drill results and news regarding this second anomaly. I have a feeling we will all be pleasantly surprised. i think we'll hear something before the next broadcast. otherwise what would they have to say to counter the negativity of the pp?
don