HIGH-GRADE NI-CU-PT-PD-ZN-CR-AU-V-TI DISCOVERIES IN THE "RING OF FIRE"

NI 43-101 Update (September 2012): 11.1 Mt @ 1.68% Ni, 0.87% Cu, 0.89 gpt Pt and 3.09 gpt Pd and 0.18 gpt Au (Proven & Probable Reserves) / 8.9 Mt @ 1.10% Ni, 1.14% Cu, 1.16 gpt Pt and 3.49 gpt Pd and 0.30 gpt Au (Inferred Resource)

Free
Message: Re: Hole 40 "stopped by Noront for technical reasons" Can anyone clarifiy this?

With approx. 270 sections (3 meters per) of drill stem in the ground they may lose the ability to steer the drill bit or maybe there isn't enough horsepower in the rig to turn all that stem or the crew is exhausted from pulling all that stem to change the diamond bits OR they ran out of drill stem.Just some possibilities.GLTA.

cs.

Share
New Message
Please login to post a reply