WSR...The table should have read as follows:
------------------------------------...
Location Hole Mineralization
------------------------------------... Visual
Hole No E.ing N.ing Dip Az EoH From To Width Description
------------------------------------... of Minerali-
meters meters meters zation
------------------------------------...
------------------------------------...
------------------------------------...
Minor iron,
copper
5.01-09 1+50E 1+00N -60 180 249.7 42.0 103.5 61.5 sulphides
------------------------------------...
Semi-
massive,
iron,
copper,
zinc
103.5 154.0 50.5 sulphides
------------------------------------...
Iron,
copper,
zinc
154.0 183.8 29.8 sulphides
------------------------------------...
Semi-
massive
iron,
copper,
zinc
183.8 201.2 17.4 sulphides
------------------------------------...
Near-
massive
iron,
copper
201.2 235.4 34.2 sulphides
then SPQ ~ 15 meters of CR
PRB ~ 30 meters of sulphide in Victory project
most of the hit holes has a massive thickness of mineralised layers...
once the assays results confirm the minerals contents..volumn is not a problem..again, the deepest drill now only go down to < 400 meters..
with PRB FNC SPQ WSR and our Noront drills result, the month of July looks very promising.