This is from the news release dated Feb19.
Read the last sentence in paragraph two.It will be interestibg to read about their methodology.
As well, read the last two sentences in paragraph 3. The way I'm reading it, if assay reults were being monitored on an on-going, real time basis, why did it take so long to discover the problem.
Thoughts anyone?
Tkd RR
ON SITE QUALITY ASSURANCE / QUALITY CONTROL MEASURES
The aforementioned assay and sample information, as well as geological descriptions are taken from drill logs as prepared by the Project geologist for the drill program, Mike Kilbourne. Billiken Management Services Inc. is providing all services on site for the Noront Double Eagle Project, from their base camp at McFaulds Lake. Billiken is a holder of Certificate of Authorization issued by the Association of Professional Geoscientists of Ontario.
All assay work and sampling procedures have been included in earlier news releases. Chain of Custody includes delivery to ALS Chemex Laboratory in Vancouver BC, where all samples undergo analysis using ALS Chemex assay procedure AA46 for nickel, copper and silver, and ICP24 for Au, Pt, and Pd. When samples received over-limit values they underwent further analysis using ALS Chemex assay procedure ICP27 (for gold, platinum and palladium), as well as GRA21 for gold. The reader is referred to: www.alschemex.com for details of these analytical procedures. All samples from the 2008 exploration program are currently being submitted to SGS Laboratory in Toronto, Ontario, details of assay methodology at SGS will be explained once assays are received.
INDEPENDENT QUALITY CONTROL AND ANALYTICAL PROTOCOL
Gold, platinum and palladium are assayed using fire assay on a 50 gram nominal sample weight with an ICP-AES finish. Nickel and copper are assayed using aqua regia (3-acid) digestion with either ICP-AES or AAS finish. A comprehensive QA/QC program has been implemented to monitor all assays on the Double Eagle Project. Samples are assembled in numbered batches of 77 samples, which equates to the number of client samples per furnace batch at ALS Chemex. Included in each batch of 77 samples are 4 certified reference material samples, 3 blank samples comprised of sterile drill core, and 4 field duplicate samples. This QC program was set up for Noront by Tracy Armstrong P.Geo, of P&E Mining Consultants Inc. ("P&E") of Brampton, Ontario. Ms. Armstrong is a qualified geologist in the Provinces of Ontario and Quebec. Assay results are being monitored on an on-going, real time basis for accuracy, contamination and precision by P&E. The current sample set will be reviewed by Ms. Armstrong once some additional batches are completed, and will be reported upon in a timely manner.