HIGH-GRADE NI-CU-PT-PD-ZN-CR-AU-V-TI DISCOVERIES IN THE "RING OF FIRE"

NI 43-101 Update (September 2012): 11.1 Mt @ 1.68% Ni, 0.87% Cu, 0.89 gpt Pt and 3.09 gpt Pd and 0.18 gpt Au (Proven & Probable Reserves) / 8.9 Mt @ 1.10% Ni, 1.14% Cu, 1.16 gpt Pt and 3.49 gpt Pd and 0.30 gpt Au (Inferred Resource)

Free
Message: Labs should be able to give us a timeline

Re: Labs should be able to give us a timeline

posted on Apr 22, 2008 07:33AM
If I say, I/we are awaiting assays, I think people are confused in thinking I/we don't have assay results already that have not yet been released. There is no need to release drill result one at a time until it meets the needs of NOT. Yes if it is material information if must be released in a timely fashion,but as long as nobody on the inside takes advantage of the info it is not illegal to with hold the drill results until you have a complete picture. ie maybe a estimated size of E2. Remember they have already told us of the find by visuals.
Share
New Message
Please login to post a reply