HIGH-GRADE NI-CU-PT-PD-ZN-CR-AU-V-TI DISCOVERIES IN THE "RING OF FIRE"

NI 43-101 Update (September 2012): 11.1 Mt @ 1.68% Ni, 0.87% Cu, 0.89 gpt Pt and 3.09 gpt Pd and 0.18 gpt Au (Proven & Probable Reserves) / 8.9 Mt @ 1.10% Ni, 1.14% Cu, 1.16 gpt Pt and 3.49 gpt Pd and 0.30 gpt Au (Inferred Resource)

Free
Message: Re: Drilling cost per meter..Good Day to all.

Feb 11, 2008 04:55AM
1
Feb 11, 2008 05:02AM
1
Feb 11, 2008 05:05AM

Feb 11, 2008 05:08AM
2
Feb 11, 2008 05:12AM

Feb 11, 2008 05:24AM

We have to keep in mind that in stepping out and chasing the tube to depth  the ghost bridge to A1 is substantially deeper than DE as it plunges to depth, this will increase time/hole considerably, so its a waiting game, just longer than we're accustomed to. Drilling on the "ghost bridge" may yeild very similar results as previous drilling, a lot more pipe down hole, bet there are truck loads of core cases on the way in to camp. On the edge of my seat.

NOTster

Share
New Message
Please login to post a reply