Four additional holes have been completed on the Double Eagle project. Hole NOT-07-02 as previously announced (August 29, 2007) was drilled from the same drill collar location as hole NOT-07-01 with an initial dip of -65 degrees. This hole entered the mineralized zone at 91.3 meters core length and remained in the mineralized zone until 164.2 meters core length (72.9 meters) undercutting hole NOT-07-01. Hole NOT-07-03 and NOT-07-04 were positioned 100 meters to the northeast and southwest of the first two holes respectively. These holes failed to intersect the mineralized zone and were in granodiorite for the entire length
BK
Can someone put a new picture together?