Hole #7 is has added some support for the consistency of true width of the minerlization, as I had been hoping. This hole intercepted 51m of sulphides, which is being reported as true width, and is consistent with the true width reported with the combined results of holes#1 and #2. Granted this is over a very limited strike length, but its still good to see constant width.
Regards,
B.
Excerpt from todays' NR:
"Hole NOT-07-07 has recently been completed. This hole is positioned at the same collar location as holes NOT-07-01 and 02 (a few meters away to allow for drill setup), however the azimuth was set at due east, to undercut Hole NOT-07-05 from the west. The initial dip of this hole was set at -45 degrees. The hole entered the peridotite bearing sulphide unit at 73 meters core length and remained in sulphides until 124 meter core length for a drill intercept for 51 meters. Chalcopyrite, pentlandite and pyrrhotite enriched sections have been reported in this drill hole. The latter sulphide intersection is believed to approximate true width."