Two drills working.
49 total holes drlled
3 holes abandoned
46 Successful
-------------------------
Drilling is continuing.
Surface trenching is 'contemplated'
Still waiting for permit so they can complete surface work before freeze.
---------------------------
7 drilled for ramp info. No gold as expected.
5 drilled over 930 meter length looking for extension plunge from previous find. First 3 of these hit gold! Waiting for results on the other two. (Thats a 60% hit rate - and maybe 100% depending on the other two hole results!).
-----------------------------
34 holes drilled around mother hole
3 of 34 hit gold (10% hit rate. I was really hoping for another mother here! The gold is there, in concentrations, they just need to find the next mother!).
------------------------------
All in all - no addtional 'Fantastic' find, which is disappointing but not unexpected as this is why they need the ramp. If the ramp can hit just one good pocket, we will be in business. Very encouraging results on the 930 meter extention drilling. Much of the gold is near surface, so the trenching will also be a big help in our search for GOLD!
-------------------------------
Please correct, add, or edit as you see fit!
Cheers.
BK