HIGH-GRADE NI-CU-PT-PD-ZN-CR-AU-V-TI DISCOVERIES IN THE "RING OF FIRE"

NI 43-101 Update (September 2012): 11.1 Mt @ 1.68% Ni, 0.87% Cu, 0.89 gpt Pt and 3.09 gpt Pd and 0.18 gpt Au (Proven & Probable Reserves) / 8.9 Mt @ 1.10% Ni, 1.14% Cu, 1.16 gpt Pt and 3.49 gpt Pd and 0.30 gpt Au (Inferred Resource)

Free
Message: Misfit Midday Numbers - TAKE III

Misfit Midday Numbers - TAKE III

posted on Sep 26, 2007 09:36AM


I heard some rumblings about where I went today ;)

I was busy performing triangulation on
the James Bay area based on the results
we have seen so far.  Thanks to S2000 for
his assistance with the triangle calculations
today and JOHNDEFER for posting his price estimates.

Highlights:

- We recognized a definite North to South
mineralization trend whereby the % values
increase as the depth increases.

- The extent of the depth on the southern edge is unknown.

- The Eastern edge looks to be 50 metres from hole 2
for a true width of 50 m.

- More data is needed for the Western side of holes 1, 2 and 5
to determine true widths.

- More data is needed for the depth of the Southern incline
to determine true lengths.

- Depth of mineralization is consistent at 120M from surface
at the North to 177M at the depth of hole 2 (at which point
it hits the Western boundary).

Here are some pictures with the numbers. We have
included known drilling angles, core lengths, and
calculated lengths using Euclidian geometry
(aka Pythagorean theorem).

Please note that we did not use the actual full
length of the drill cores, but only those that
reflected significant mineralization.  With the
angles in holes 1 and 2, the "ends" of the cores
with no value did not have an impact as these
were at the boundary of what appears to be
an Eastern wall (as you will see below). 

This post is not intended to pump or bash.
It is meant to create discussion. We believe it
is as accurate as we could make it given the
info provided to us through NRs to date.
No rumour data was used.


FIRST, the layout of the land:



































Next, the depths and widths of holes 1 and 2:


































Now, the estimated lengths between holes 1, 2 and 5:


































Finally, some calculations:


































We encourage those that are technical
on here to check and double check my numbers.
This effort is a continuation of what others on this board
(like johndefer and fairchij) have already started.

Please remember that these are initial values that we
believe to be real depths, lengths, and widths
between hole 5 and holes 1 and 2.  This is by no means
the extent of the property or the final tonnage numbers.

There is still a lot of drilling to go on.  As well, the SP
does not reflect any of the other Noront properties such
as Windfall, Burnt Hill, Lizar, Mexico, China, or Hunter's Point.

Misfit1 and S2000.































Sep 26, 2007 09:40AM
Share
New Message
Please login to post a reply