assays were sent to the lab on july 22
Drill hole McF-07-75 was set up on line 8+25 NE and the initial dip was -64
degrees for a total length of 192 meters. The hole was designed to overcut
historic 2004 hole McF-04-41 (6.49% Cu and 3.45% Zn o over 8 meters) and
infill an area in the mineralized zone that had not been previously tested, as
required for an update on the resource estimate for this occurrence. The
mineralized zone was encountered between 164.28 meters and 183.3 meters (19.02
meters). This intersection consisted of massive sulphides, mostly chalcopyrite
and sphalerite. Samples were selected from this section and were sent to the
lab on July 22, assays pending.