Mineral Resources as of 01 January, 2011:
Measured: 2,124 kt grading 2.72 g/t Au, 40.01 g/t Ag, 2.26% Cu, 2.07% Zn
Value per tonne 0.094oz Au, 1.38oz Ag, 49.7lb. Cu, 45.5lb.Zn = $448/tonne.
Indicated: 27,726 kt grading 1.62 g/t Au, 38.79 g/t Ag, 1.53% Cu, 3.22% Zn
Value per tonne 0.056oz.Au, 1.34oz.Ag, 33.7lb.Cu, 70.8lb.Zn = $350/tonne
Inferred: 10,570 kt grading 0.67 g/t Au, 47.78 g/t Ag, 0.91% Cu, 5.67% Zn
Value per tonne 0.023oz.Au, 1.65oz.Ag, 20lb.Cu, 124.7lb.Zn = $313/tonne.
Mineral Reserves, Effective Date: 01 January, 2011
Ore Type Ore Au Ag Cu Zn
(kt) (g/t) (g/t) (%) (%)
Oxide
Proven 933 5.75 21.90
Probable 3,719 7.39 31.48
Combined(cut-off~1.0g/t(2)) 4,651 7.06 29.56
Supergene
Proven 844 0.80 43.47 4.92
Probable 6,537 0.77 31.29 3.77
Combined(cut-off~0.50%Cu(2)) 7,382 0.78 32.68 3.90
Primary
Probable 15,759 0.72 44.12 0.97 5.31
Combined(cut-off~0.75%Zn(2)) 16,279 0.72 44.40 0.97 5.40
Total Proven (tonnes) 2,298 2.80 36.77 2.07 1.98
Total Probable(tonnes) 26,015 1.69 39.09 1.55 3.26
Proven & Probable Total 28,313 1.78 38.90 1.60 3.15
(2) Cut-off is based on NSR, Oxide = $29.03/t, Supergene = $26.57/t, Primary = $26.68/t, cut-off grade values shown above are approximate and may be affected by other metal values in the deposit.
Mine life extended to 13 years and waste-to-ore strip ratio increases slightly to 4.2:1.
Bisha 13 year undiscounted cash flow now totals $2,162,000,000 using $1,200/oz gold, $24/oz silver, $3.30/lb copper and $1.00/lb zinc, all on an after-tax, after expansion capex basis.