Greenstone Belt - The richest in Canada per km²

Exploration & Development of zinc, copper & gold assets in Canada.

Free
Message: Looking Good

.

Check out these first four HOLES...

Murgor Resources Inc. has released the results from its first four drill holes at the Golden Arrow gold project, located 65 kilometres east of Timmins, Ont. The first four holes were drilled from the 90-foot bench of the Golden Arrow open pit and were designed to test the gold mineralization below the open-pit floor.

Hole ID  From (m)  To (m) Length (m) Au (g/t)

A10-01     33.00   64.00      31.00     1.71  
including  42.00   54.00      12.00     2.52  
A10-02     31.00   62.00      31.00     1.63  
including  50.00   61.00      11.00     2.12  
A10-03     41.00   84.00      43.00     2.27  
including  59.00   78.00      19.00     3.43  
A10-04     34.00   96.00      59.00     2.64  
including  35.00   66.20      31.20     3.21  
and        85.00   96.00      11.00     2.94  



True widths equal 75 per cent of reported core lengths.

.....RL

Share
New Message
Please login to post a reply